top of page
Search

Happy Christmas from Gritblasting UK

  • Gritblasting UK
  • Dec 15, 2021
  • 1 min read

Its been a very busy year for us, and we now take a moment to look back at the variety and quantity of work we've been able to do for our clients this year. As well as launching our concrete floor preparation division, we have travelled the UK with our mobile blasting units, and continue to provide local contracted services from our blasting facilities at Devizes and Andover.

ree

In addition to our concrete floor preparation work, we have completed surface preparation on a vast range of other structures and vessels. These include fire escapes, water containers, steels, steel bridges, lorry bodies, stone work, and vehicles such as gritters. We've even worked on a recycling plant elevator which was being refurbished.


One new aspect of our work this year has been outdoor sculptures. At Warwick university, we blasted and repainted an external sculpture, and in recent weeks have completed the surface preparation for one of the bronze sculptures at The Sculpture Park in Surrey.

ree

Its been a varied and exciting year, and we look forward to 2022.


If you have an upcoming project that requires surface preparation, do give us a call.


We wish all our clients, partners and suppliers and your families a safe and Happy Christmas from us all at Gritblasting UK.

ree

 
 
 

Comments


Grit Blast UK - Copyright 2025

T:  01225 775 519 or 07811 770 635

bottom of page